Blog

Inside Our 8-Step Mass Production Process

A walkthrough of our Dongguan facility — from mold shop to dustless painting booth to final pre-shipment QC.

Certified: Disney FAMA • SGS • BSCI • ISO 9001 • Eco-Friendly

Back to blogNovember 14, 20257 min read
Inside Our 8-Step Mass Production Process
FactoryProcess

Inside Our 8-Step Mass Production Process

Every approved sample at Ruihan Industrial is followed by a consistent, repeatable production workflow. Here is what happens after you greenlight the paint master.

Step 1 — Mold Making

Steel or aluminum tooling is cut on CNC machines, then polished and tested with short-shot trials.

Step 2 — Blank Figure

Injection or rotocast machines produce raw bodies. Each cavity is numbered so we can trace defects back to source tooling.

Step 3 — Dustless Painting

A filtered spray booth eliminates airborne particles before Pantone-matched coats are applied.

Step 4 — Pad Printing

Eyes, logos and fine details are transferred with silicone pads. Registration is checked every 50 units.

Step 5 — Assembly

Multi-part SKUs are assembled station-by-station with torque-tested joints where required.

Step 6 — Quality Control

A 15-person QC team runs AQL 2.5 inspection. SGS pre-shipment audits are offered on request.

Step 7 — Packing

Blister, window box, gift box or poly bag — packaging is engineered alongside the figure, not bolted on at the end.

Step 8 — Shipped

FOB, CIF or DDP. Air, sea or rail. Our forwarder network reaches 60+ countries.

Published by Ruihan Studio on November 14, 2025.

Ready to turn your concept into a retail-ready figure?

Send us your brief and our sales engineers will respond within one business day with a tailored proposal.